The bill has fallen. The energy decisions are getting harder.
Latest DfE returns show recorded energy expenditure per pupil fell in matched academy and maintained-school cohorts in 2024/25. They do not show that buildings used less energy. School Connection follows the missing handoffs from cost to meter, condition, funded action and verified result, and maps the decisions now converging in September 2026.
The answer in brief
A lower energy-cost signal does not close the energy-management problem.
The latest comparable school returns point down from the 2023/24 peak. The public record still cannot say whether a particular school bought energy more cheaply, used less, changed its operating pattern or corrected a data problem. The leadership task is to make every handoff from cost to verified outcome visible.
- Spend is not usage. Financial returns cannot establish kilowatt-hours, efficiency or cause.
- A recommendation is not a project. Condition, dependencies, cost, approval and a delivery route still have to meet.
- Installation is not a saving. Commissioning and post-project evidence decide whether the intended benefit arrived.
01 / The latest spend
Recorded energy expenditure per pupil fell by about one fifth in both matched England cohorts.
School Connection matched unique URNs with a full 12-month return in both 2023/24 and 2024/25. Within each sector, it summed the reported energy line and divided it by the summed pupil denominator. Maintained schools use CFR data and academies use AAR data; they remain separate analyses because the return and accounting bases differ.12
| Matched cohort | Schools | 2023/24 | 2024/25 | Change |
|---|---|---|---|---|
| Maintained schools · CFR | 10,323 | £178.21 per pupil | £142.48 per pupil | −20.0% |
| Academies · AAR | 9,926 | £167.69 per pupil | £136.76 per pupil | −18.4% |
This is a matched-cohort cash-expenditure result, not a national total, a 2025/26 result or a measure of energy consumption. The academy and maintained-school levels should not be used as a sector league table. Central-service energy outside an academy-level return is not added to the academy calculation.
The market evidence moved in the same direction without resolving the cause. DESNZ reports that average UK non-domestic prices including the Climate Change Levy were 24.14 pence per kWh for electricity and 5.17 pence per kWh for gas in Q1 2026, down 6.2% and 6.7% respectively from Q1 2025. Those figures are provisional averages across non-domestic consumers, not school tariffs, and cannot explain the school-return movement on their own.3
02 / Four evidence clocks
The current picture is assembled from records that stop at different dates.
2024/25
The latest public CFR and AAR downloads support a full-year, like-for-like financial comparison. They do not report 2025/26 national school energy expenditure.
Q1 2026
Quarterly Energy Prices supplies the latest verified non-domestic price comparison used here. It is broader than education and is provisional.
10 Sep 2026
Estate reporting, retrofit, solar, procurement and building-policy evidence are reviewed to today’s publication cut-off.
Certificate records add a fourth clock because issue date, measurement period, validity, building boundary and method vary. A joined energy story is credible only when every figure keeps its own period, geography and unit. Re-dating an older financial result to the policy cut-off would manufacture recency.
03 / One estate, six records
Schools do not lack energy records. The records answer different questions.
| Record | Unit observed | What it can establish | What it cannot establish |
|---|---|---|---|
| Finance return or bill | School, trust or account | Recorded expenditure | Whether price, consumption, error or timing caused it |
| Meter data or DEC | Supply point or building | Consumption or an operational signal | Whether that consumption was necessary or avoidable |
| EPC, audit or condition record | Building or asset | A modelled opportunity, condition or defect | A deliverable, affordable project |
| Costed option | Proposed intervention | Scope, dependencies and estimated value | Approval or available funding |
| Funding or procurement record | Project or contract | Decision, allocation or award stage | Completion or operating performance |
| Commissioning and monitoring | Installed asset or project | Whether delivery and initial benefit were verified | Long-term persistence without continued review |
DfE’s energy-efficiency guidance starts with management, data and demand before major plant or generation decisions. Its long-term estate-planning guidance places decarbonisation inside condition, resilience, education need and delivery planning.117 Read our existing energy-baseline analysis for the detailed starting sequence.
04 / The 2025/26 transition
The year changed the route from evidence to action more than it changed the evidence itself.
- Dec 2025
The 2024/25 maintained-school expenditure release established the latest full-year financial baseline.
It records what was spent. It cannot identify the energy used, tariff exposure or building cause.2
- Feb 2026
The Education Estates Strategy connected capital, common data and decarbonisation over a longer horizon.
The stated £38 billion covers education capital from 2025/26 to 2029/30. It is not an energy allocation and is not evidence that money has reached a particular school.6
- Jun 2026
- Jul 2026
- Across 2025/26
Leadership expectations moved closer to operating practice.
DfE’s sustainability-lead and climate-action-plan material remains non-statutory guidance. The useful test is whether a plan changes ownership, priorities and verification, not whether a document merely exists.12
05 / What is happening now
September turns energy evidence into a live estate-governance test.
England’s first School Estate Management Standards annual return opens for eligible responsible bodies in the third week of September and closes in late November. Individual schools do not submit it. DfE describes a light-touch, multiple-choice return with no supporting-document upload, no funding consequence and no penalty or criticism for answers that show work remains.45
A responsible body may be able to answer the form without proving that bills, meters, certificates, condition evidence, plans and completed work reconcile across every site. The practical value is the owned improvement log produced behind the answer. Read the full 28-question evidence map.
First estate return
Prepare the source record, owner, property scope, last check and next action behind every proposed answer before the window opens.
Retrofit fund registration
Window 3 registration runs to 18 September 2026 for eligible public buildings, including schools. Eligibility is not selection, and the route is not national.21
PPA pilot procurement
DfE expects procurement in autumn 2026. At the evidence cut-off, template testing and the approvals pause still matter; the wider 2027/28 route is an ambition, not an entitlement.10
Smart-meter contract preparation
The current task is to connect contract dates, meter status and site readiness before the affected 2027 condition. Read the dedicated smart-meter feature.
06 / The seven handoffs
Every saving claim should be traceable across seven decisions.
- 01
Cost seen
Reconcile the bill or return to the correct organisation, site, period, tariff and supply.
- 02
Use measured
Check meter coverage, estimated reads, fuel split, floor area, operating hours and an appropriate baseline.
- 03
Cause investigated
Separate price, weather, occupancy, controls, equipment, building condition and data error before selecting a response.
- 04
Option scoped
Define the intervention, affected assets, dependencies, disruption, competent advice and expected service outcome.
- 05
Case costed
Record capital, revenue, maintenance, contract term, risk, whole-life value and the evidence behind the estimate.
- 06
Action funded and delivered
Distinguish announced, allocated, contracted, installed and commissioned. They are different stages.
- 07
Benefit verified
Compare cost, consumption and service outcome with the agreed baseline after commissioning and again over time.
A missing public link means “not publicly observable”. It does not mean a school failed to act. School Connection will not turn incomplete joins into named-school waste claims, efficiency rankings or supplier opportunity signals.
07 / Routes to action
Funding has not disappeared. Access has fragmented.
Condition-led selection
Phase one covers Yorkshire and the Humber, the East Midlands and the South East in 2026/27. DfE selects settings; there is no bid window. The £710 million programme runs to 2029/30.68
Funded installations and additions
Government reported 245 settings with funded panels and a further 100 backed by up to £40 million. An installation count is not verified annual saving.9
Private finance and a long contract
The provider funds, installs and maintains panels; the setting buys generated electricity at an agreed rate. Roof condition, value for money, approvals and exit terms remain leadership questions.10
Delivery, not a general new round
Final PSDS projects remain in delivery. The official Low Carbon Skills Fund collection states that no funding was available in 2025/26. Neither should be presented as a live national application route.1314
The result is a portfolio problem. A school may need to align condition funding, planned maintenance, a selected national programme, place-based support or a long-term energy contract. Each route has a different applicant, geography, evidence test, accounting treatment and decision date. Our estate-triage framework separates live risk, investment priority and programme eligibility.
08 / A 90-day leadership plan
Move one material energy signal all the way through the evidence chain.
Now: Build one matching register
Join site, supply, meter, contract, expenditure, certificate, accountable owner and next review date.
By half-term: Separate price from use
Classify each material signal as unverified, diagnosed, scoped or action-ready. Investigate exceptions rather than naming waste.
Before the budget cycle: Create a decision-grade shortlist
Add lifecycle cost, dependencies, funding status, procurement route, approval point and fallback.
At delivery: Define acceptance before installation
Set the baseline, commissioning test, data owner, handover record and evidence needed to accept the work.
After delivery: Verify the outcome
Check cost, consumption and service performance against the agreed boundary, then set the next review.
Can one recorded cost be followed to the right building, a tested cause, an owned decision and a result that was measured after delivery?
09 / Certificate regimes
A UK energy view must not flatten different legal and technical records into one score.
| Jurisdiction | Current record | What it represents | Publication caution |
|---|---|---|---|
| England and Wales | DEC for qualifying public-authority buildings over 250m² | Operational rating based on recorded energy use and a benchmark | Over 1,000m²: 12 months. 250–1,000m²: 10 years. Reform proposals do not replace current law until implemented.1617 |
| Scotland | Displayed asset EPC for qualifying public buildings | Asset rating under a distinct Scottish regime | Do not compare it directly with an operational DEC. The announced 2028 reform timetable remains a forward position until its legal steps and commencement are evidenced.1819 |
| Northern Ireland | Annual DEC for qualifying public-authority buildings over 250m² | Operational rating under Northern Ireland regulations | Keep the jurisdiction, reporting period and building boundary attached to every comparison.20 |
Certificates can support a diagnosis when the building boundary, period and method align. They do not, on their own, prove what should be procured or whether a proposed project will perform.
10 / Forward watch
The next four years contain confirmed dates, planned programmes and ambitions. They are not the same thing.
| When | Status | Evidence point | Leadership meaning |
|---|---|---|---|
| 18 Sep 2026 | Confirmed deadline | Greater Manchester retrofit registration closes.21 | Place-specific route; no implication for schools elsewhere. |
| Third week Sep to late Nov 2026 | Confirmed window | First English SEMS annual return.4 | Use submission to expose and own evidence gaps. |
| Autumn 2026 | Expected next step | PPA-pilot procurement.10 | Check the published template and approvals position before commitment. |
| 24 Mar 2027 | Made, future commencement | Future Buildings Standards changes commence for ordinary building work, subject to transitional provisions.15 | Future project design and procurement issue; not a new duty on every existing school today. |
| From Apr 2027 | Planned expansion | Renewal and Retrofit extends across English regions.8 | Prepare condition and delivery evidence; it remains a selected route. |
| 2027/28 | Stated ambition | DfE aims to make a PPA route more widely accessible.10 | Do not budget an entitlement before the route and terms are confirmed. |
| From autumn 2027 | Planned rollout | Common estate-data standards move towards national collection.6 | Identifiers and ownership become as important as the technology platform. |
| 31 Mar 2028 | Confirmed programme deadline | Final PSDS Phase 4 delivery period ends.13 | For funded projects, commissioning and benefits evidence should already be designed. |
| By autumn 2028 | Planned programme change | DfE plans to replace CIF with a new capital-maintenance model.6 | Do not treat the future model as operative until detailed rules are published. |
| From 2029 | Planned national availability | Renewal and Retrofit delivery partners across every English region.68 | Delivery capacity and sequencing will determine whether a selected intervention becomes an operating result. |
| 2029/30 | Current funding horizon | End of the stated £38 billion capital period and £710 million Renewal and Retrofit envelope.6 | Funding-period totals do not prove allocation, payment, completion or saving at school level. |
11 / Evidence boundary
What this analysis establishes, and what it deliberately does not claim.
Established here
- A reproducible matched-cohort movement in recorded 2023/24 to 2024/25 energy expenditure per pupil.
- Current official market, estate-return, programme, solar, funding and certificate positions at the stated cut-off.
- A leadership framework for joining cost, consumption, condition, action and verification.
- Confirmed, planned, proposed and aspirational milestones labelled separately.
Not established here
- National school energy expenditure, consumption or efficiency for 2025/26.
- The cause of the movement in any school’s energy bill.
- That a missing public certificate or project link means no action occurred.
- That announced funding was allocated, paid or converted into a verified saving.
- A named-school waste, compliance, condition, distress or supplier-opportunity ranking.
Method note: The matched calculation keeps only unique URNs with 12-month returns in both years, a positive pupil denominator and a reported energy value. It aggregates energy expenditure and pupils within each cohort before calculating the per-pupil rate. CFR and AAR results remain separate. This is editorial analysis of public data, not engineering, procurement, accounting or legal advice.
12 / What we are monitoring next
The finding will move when the evidence moves.
- 2025/26 CFR and AAR releases, their definitions and whether a comparable matched cohort can be rebuilt.
- The opening, exact closing date, publication policy and any aggregated findings from the first SEMS annual return.
- Quarterly non-domestic price evidence and the extent to which school-specific meter periods can be aligned without inferring causality.
- PPA templates, approval resumption, procurement outcomes and evidence of commissioning rather than projected savings.
- Renewal and Retrofit selection, regional expansion, PSDS completion and the planned capital-maintenance replacement.
- Made legislation or regulator guidance that changes certificate validity, method, access or commencement in any UK nation.
Energy intelligence becomes useful when it changes the next decision without claiming more than the evidence can prove.
Related public intelligence
One connected development to follow.
Gigabit is coming to more schools. The connection is only the beginning.
The DfE's new gigabit programme is an opportunity to close a stubborn infrastructure gap and strengthen the digital foundations schools increasingly depend on. Our analysis shows where the opportunity is greatest, what changes operationally when connectivity improves, and what school and trust leaders should be thinking about now.
Read the connected briefingRelated intelligence is drawn only from the editor-approved public feed; private candidates and commercial data remain excluded.
Sources and methodology
Evidence used in this analysis
School Connection links to the primary source behind each material claim. Source status, period and limitations are stated so readers can reproduce the evidence trail.
- 01
Department for Education · 2023/24 and 2024/25 CFR and AAR downloads reviewed 10 September 2026
Financial Benchmarking and Insights Tool: data sources
Source files for the matched-cohort calculation. CFR and AAR are separate return systems and are analysed separately. - 02
Explore Education Statistics · Published 11 December 2025; updated 30 June 2026
LA and school expenditure: 2024 to 2025
Official maintained-school expenditure release and methodology context. The series records cash expenditure, not metered consumption. - 03
Department for Energy Security and Net Zero · Published 30 June 2026
Quarterly Energy Prices: June 2026
UK average non-domestic price evidence. Q1 2026 figures are provisional and are not a school-tariff series. - 04
Department for Education · Published 17 July 2026; updated 10 August 2026
School estate management standards annual return
Current scope, eligibility and timetable for the first light-touch return by eligible responsible bodies in England. - 05
Department for Education · Published 23 April 2025
School estate management standards
The current framework connecting governance, condition, maintenance, sustainability, resilience and estate data. - 06
Department for Education · Published 11 February 2026; updated 16 February 2026
Education Estates Strategy: a decade of national renewal
The £38 billion 2025/26 to 2029/30 education-capital context, annual-return direction, common-data programme and Renewal and Retrofit commitments. The total is not energy-specific. - 07
Department for Education · Published 25 February 2026
Improve and renew your long-term estates plan
The seven-step official planning sequence for baseline evidence, condition, resilience, decarbonisation and delivery. - 08
Department for Education · Published 15 June 2026
Renewal and Retrofit programme
The condition-led 2026/27 first phase, regional coverage and planned expansion. The programme is not open to bids. - 09
Department for Education and Great British Energy · Published 16 July 2026
Hundreds more schools to save on bills as government solar drive expands
Reports 245 funded installations, a further 100 settings backed by up to £40 million and the separate PPA pilot. - 10
Department for Education · Published 16 July 2026
Funding for installing solar photovoltaic panels on schools and colleges
Current PPA-pilot terms, roof and value-for-money conditions, approvals pause and expected autumn procurement timetable. - 11
Department for Education · Current guidance reviewed 10 September 2026
Energy efficiency guidance for the school and further education college estate
Official energy-management sequence covering data, controls, fabric, systems and renewable generation. - 12
Department for Education · Current guidance reviewed 10 September 2026
Sustainability leadership and climate action plans in education
Non-statutory guidance on sustainability leadership and action planning. It is not framed here as a new compliance duty. - 13
Department for Energy Security and Net Zero · Published 16 June 2026
Public Sector Decarbonisation Scheme delivery data
Current delivery evidence for previously awarded projects. Phase 4 is final and the scheme is not presented as an open route. - 14
Department for Energy Security and Net Zero · Collection reviewed 10 September 2026
Public Sector Low Carbon Skills Fund
Official collection confirming that no funding was available in financial year 2025/26. - 15
Ministry of Housing, Communities and Local Government · Published 24 March 2026
Future Homes and Buildings Standards: Building Circular 01/2026
Made changes and commencement dates relevant to future building work. They are not treated as a current requirement for existing buildings. - 16
UK Government · Current response reviewed 10 September 2026
Reforms to the Energy Performance of Buildings regime: partial government response
Records the England and Wales reform position. Unimplemented proposals are not presented as current law. - 17
legislation.gov.uk · Current legislation accessed 10 September 2026
Energy Performance of Buildings (England and Wales) Regulations 2012, regulation 14
Current Display Energy Certificate duty for qualifying public-authority buildings in England and Wales. - 18
Scottish Government · Published 24 August 2026
Energy Performance Certificate reform update
The latest Scottish reform timetable. Planned changes are labelled as planned or proposed until approval and commencement are evidenced. - 19
legislation.gov.uk · Current legislation accessed 10 September 2026
Energy Performance of Buildings (Scotland) Regulations 2008, regulation 9
Current Scottish public-building certificate display requirement, which uses an asset EPC rather than the England and Wales operational DEC model. - 20
legislation.gov.uk · Current legislation accessed 10 September 2026
Energy Performance of Buildings (Certificates and Inspections) Regulations (Northern Ireland) 2008, regulation 11
Current Northern Ireland DEC requirement for qualifying public-authority buildings. - 21
Greater Manchester Combined Authority · Window 3 timetable reviewed 10 September 2026
Public Building Retrofit Fund
Place-specific live route. Registration closes 18 September 2026; eligibility does not establish selection or funding.