Feature / Editorial features
The market price is only part of your school’s energy bill
The 2027/28 energy budget needs more than a view on wholesale prices. Official network and balancing forecasts already give schools figures to test, alongside published distribution charges and policy and tax changes. The useful step is turning that evidence into a dated allowance for the school’s own supplies.
Expanded on 16 November 2026 with the 2027/28 official cost outlook, component calculations and a budget explorer. Market observations and forecasts retain their own dates.
The next budget needs more than a wholesale assumption
A school business manager preparing the next budget needs to know what can sensibly be allowed for now and what still needs testing. Waiting for a better wholesale price will not answer every question. Some costs can already be checked against published schedules; others remain forecasts, with decisions due before the new financial year.
The forecast for one low-voltage transmission band translates into about £1,327 extra over the year for that component alone. The calculation below makes the band, period and assumptions visible. This gives the school a figure to discuss with its supplier, rather than a general prediction that every energy bill will rise.
These figures give leaders a more useful starting point than a general warning that bills are rising. Ask which components reach your agreement, which assumptions support the allowance and when those assumptions will be reviewed. A school can then prepare for uncertainty without presenting it to governors as a settled charge.
A lower energy rate can still leave a higher total
The following invented comparison isolates the arithmetic. It uses the same 100,000 kWh of electricity and the same 365-day period in each case. The energy-only rate excludes all the other costs shown. The separate-charge totals are invented aggregates of every other pre-tax supply and service cost, counted once. This is not a tariff forecast, supplier offer or reported school account.
| Illustrative component | Earlier period | Later period |
|---|---|---|
| Electricity used | 100,000 kWh | 100,000 kWh |
| Energy-only rate | 20p/kWh | 18p/kWh |
| Energy-only cost | £20,000 | £18,000 |
| All other pre-tax charges, counted once | £6,000 | £9,000 |
| Total before VAT and any applicable Climate Change Levy | £26,000 | £27,000 |
Here, a £2,000 reduction in the energy element is outweighed by £3,000 in additional charges, leaving the total £1,000 higher. The official figures below show which actual components schools can now test.
Transmission: turn the published band into annual pounds
The National Energy System Operator’s (NESO) five-year view, version 3 of 30 October, forecasts transmission tariffs from 2027/28. We have compared its low-voltage LV1 to LV4 demand-residual rates with the final 2026/27 rates. These are charging categories, not school-size categories. Confirm the assigned category and band with the supplier before applying them.
The daily rate for LV2 is forecast to rise by 31.2%; for LV4, by 37.5%. The table converts each rate into the annual component for one chargeable site. It uses 365 days for 2026/27 and 366 for 2027/28, which includes 29 February. The daily-rate percentages exclude that extra day; the annual figures include it.
This is the transmission demand-residual component only, excluding locational transmission charges, tax and every other bill element. The comparison assumes an unchanged band and uses unrounded daily rates. The 2027/28 figures remain forecasts. The agreement determines whether, when and how the school is exposed.
Transmission Demand Residual only: final 2026/27 compared with forecast 2027/28. One chargeable site, unchanged assigned band; before tax.
| Band | 2026/27 final | 2027/28 forecast | Annual difference |
|---|---|---|---|
| LV1 | £2,116.05 | £2,486.40 | +£370.35 |
| LV2 | £4,201.82 | £5,529.24 | +£1,327.42 |
| LV3 | £5,249.20 | £6,393.22 | +£1,144.02 |
| LV4 | £13,935.74 | £19,210.36 | +£5,274.62 |
NESO final 2026/27 rates, Table 10 →NESO forecast, version 3, Table 15 →
Balancing: the newer forecast changes the planning conversation
Balancing Services Use of System (BSUoS) charges fund day-to-day system operation. NESO’s September draft for 2027/28 has already been followed by a higher, highly indicative monthly tariff forecast, published on 13 November. Both remain distinct from the final tariffs expected in December. A budget based on the September figures needs its assumptions revisited.
The table shows the published final rates for the corresponding 2026/27 periods, the September draft for 2027/28 and the newer indicative outlook. With 50 MWh of chargeable volume in each half-year, those three bases produce component costs of £1,311.50, £2,004.50 and £2,732.50 respectively. That is a £1,421 difference between current rates and the newer indication, under the stated profile.
Balancing costs are influenced by wholesale prices, transmission constraints and the recovery of earlier costs. They should not be described as wholly independent of the market. The school’s import profile, chargeable volumes, losses, supplier additions and contract treatment still need confirmation. Use the explorer to change the volumes while keeping the component separate from the total bill.
BSUoS rates in £/MWh. The 2027/28 draft and newer indicative forecast are not final tariffs.
| Official basis | Apr to Sep | Oct to Mar |
|---|---|---|
| 2026/27 final | 13.74 | 12.49 |
| 2027/28 draft, 21 September | 21.67 | 18.42 |
| 2027/28 highly indicative, 13 November | 29.71 | 24.94 |
NESO current final rates →NESO September draft →NESO newer indicative forecast →
Try the component budget arithmeticChange the half-year volumes and, if confirmed, the residual band.
Illustrative starting profile: 100,000 kWh of annual BSUoS-chargeable volume, split equally across the two half-years. Replace these assumptions with supported figures for your school.
Newer indication less current-rate basis: £1,421.00. Balancing component only, using the same assumed volumes.
No transmission amount selected. Confirm the assigned band with your supplier. LV1 to LV4 do not cover every connection category.
Balancing cost = April to September kWh ÷ 1,000 × that period’s rate, plus October to March kWh ÷ 1,000 × its rate. Rates and source versions are fixed to the evidence checked on 16 November 2026.
These are component sensitivities, not a school bill forecast. Actual chargeable volumes, losses, supplier additions and contract inclusions require confirmation. Keep the components separate until reconciled with the offer. Do not add an amount already included in the price.
No enquiry is sent by this tool. Use the support request below if you need help with your school’s arrangements.
Distribution and policy need a calculation for each supply
Local distribution costs need a different approach. National Grid Electricity Distribution’s Clearview service shows published charges through 2027/28 for its licence areas, with forecasts from 2028/29. Its East Midlands statement already gives published final charges effective from April 2027. Other networks have their own schedules. Ask for the distributor, tariff identifier, band, capacity and time-band demand behind each calculation.
DESNZ’s September calculation gives a 2027/28 Great Britain Renewables Obligation of 0.369 certificates per MWh under the existing arrangements, or an indicative 0.394 if the proposed manufacturing exemption is implemented in time. A further note is due to confirm the applicable level. These certificate obligations are not themselves school prices per kWh.
November regulations allow one revision of the 2027/28 obligation for England and Wales by the end of March. The government also plans funding through the Contracts for Difference framework to offset the industrial scheme’s residual costs across the system. Individual contracts affect how that reaches prices. Ask for the net policy allowance, including relevant offsets.
The finance question is which published schedule or policy case supports the allowance in pounds. Keep a conditional input visible until it is resolved. A single percentage across every meter can conceal differences in tariff, demand and contract treatment that matter more to the school than the national headline.
NGED published and forecast distribution charges →East Midlands 2027/28 published charging statement →DESNZ 2027/28 Renewables Obligation calculation →Regulations allowing revision of the 2027/28 Renewables Obligation for England and Wales →DESNZ: industrial scheme funding, levy offsets and contract treatment, 3 November 2026 →
Tax dates and the school’s budget year need to line up
HMRC’s temporary zero rate for qualifying electricity in Great Britain ends on 30 June 2027 under the published arrangements. An April-to-March 2027/28 budget therefore crosses that date. Establish the qualifying use, the treatment after relief ends and what VAT the school can recover. This is not a universal zero rate for schools, and it does not cover gas.
Where Climate Change Levy applies, the published main electricity and gas rate increases from £0.00801 to £0.00827 per kWh in April 2027. At an unchanged 100,000 liable kWh, that changes the levy from £801 to £827: £26 extra before any applicable VAT. Charity non-business supplies are excluded. Confirm the actual liability and mixed-use treatment.
A charging year is not necessarily the school’s budget year. An academy planning September to August may need to split its allowance at the following April, when another tariff year starts. Match dates and forecast consumption to each period. Keep tax, price and consumption effects distinct so the governing body understands what has changed.
Keep the observed market separate from the forward allowance
Our electricity desk’s observed wholesale series averaged £210.92/MWh over 9 to 15 November, 2.8% above the preceding complete week. Both weeks contain all 336 expected half-hours. Those are short-term Elexon market-index observations. They describe what happened in the wholesale market; they do not supply a forward price for the school’s 2027/28 contract.
A fixed contracted rate may reflect purchases made much earlier. A flexible arrangement may combine several purchasing dates. Ask the supplier or adviser to explain which delivery periods and purchases inform the offer, then identify what is included, passed through or reconciled. The domestic energy price cap does not set the price of a school’s non-domestic agreement.
That is why the observed-price table and the official cost outlook belong together, while answering different questions. Follow the electricity desk for the latest dated observations and source checks. Use the contract and supply schedule to establish the school’s exposure.
Demand reduction and solar change the calculation, not every charge
Longer opening hours, a new building or different heating can change consumption. A billing correction can change a payment without representing a new price increase. Before projecting next year, reconcile comparable bills, actual or estimated readings, billing days, credits and estate changes. The forecast needs a reliable starting point.
Efficiency and onsite solar can reduce imports, but the avoided cost must reflect charges the project can genuinely remove. A continuing fixed or banded charge may remain even when fewer kWh are bought. Model import reductions against the remaining demand after efficiency work, the contract terms, generation timing and the school’s operating calendar.
Capacity charges deserve a separate check from residual charging bands. Reducing agreed capacity may affect capacity costs, but NGED’s distribution guidance says it does not automatically change the residual band. Confirm the relevant transmission and distribution banding rules separately, alongside future electrical needs. A solar proposal should not claim a saving merely because a charge appears on the existing bill.
NGED explains distribution residual bands and capacity changes →Explore the school solar and PPA programme →
Give each allowance a review date and an owner
Useful budget preparation produces a calculation by supply, rather than a broad percentage to defend later. Ask the adviser to return the consumption assumptions, component amounts, source versions, contract clauses and outstanding conditions. The total should reconcile to the proposed agreement, with included charges counted once. Name who will update each unresolved item.
NESO’s current timetable targets draft transmission tariffs by 30 November and final tariffs by 31 January 2027, with dates subject to change. Final balancing tariffs and the April to June 2027 Contracts for Difference levy rate are expected in December. Review those publications, the Renewables Obligation confirmation and the published June VAT-relief end date before finalising allowances.
The governing body should be able to see the adopted allowance, the alternative case if a forecast changes and the exposure the school has accepted. Academy trusts, maintained schools and independent schools then follow their respective procurement and approval arrangements. A documented budget assumption supports that decision; it does not replace it.
Take a supported allowance into the budget discussion
The practical outcome is a 2027/28 energy allowance with reasons behind it: which supplies it covers, which rates are published, which inputs remain uncertain and when the calculation will be refreshed. That gives school leaders something concrete to discuss while preserving the flexibility to respond as the evidence changes.
Start with the current agreement, recent bills, available consumption records and known estate plans. If specialist help is needed, request energy support with the renewal timing, number of sites, previous procurement route and the issue to resolve. School Connection will discuss a suitable introduction and confirm the named organisation and your permission before sharing details.