Independent UK education editorial Evidence · leadership · action

AboutMethodologyContact
SCHOOL CONNECTIONEDITORIAL NETWORK

See the change. Examine the evidence.
Understand what it means for schools.

Editorial intelligenceAcademic year 2026/27
Menu

A specialist guide / Connected with chapter 04

Understand the environment before choosing a solution

Noise, lighting, movement and the use of space can affect participation. Establish the difficulty in its setting before selecting equipment, specialist advice or building work.

Where you are in the programme

A corridor can become a very different place when several classes move through it at once. A room that feels calm during a visit may be difficult to use during an ordinary lesson. Before selecting a sensory resource or changing a space, a school needs to understand the conditions in which the difficulty occurs.

The inclusion strategy offers a place to explain that priority and the intended improvement. The detailed assessment should help leaders distinguish a change to everyday practice, a resource purchase and an alteration to the building.

Examine the environment while it is being used

Bring observations from different points in the day together with the experience of pupils and staff. Consider sound, lighting, visual demands, temperature, movement and the predictability of transitions. Record what changes between a manageable moment and a difficult one. Avoid treating one description of discomfort as evidence that a particular product is required.

Include the people responsible for the space, teaching and support. Where needs require specialist assessment or advice, use an appropriately competent professional and agree the question their work should answer. This guide does not provide a clinical assessment or establish a diagnosis.

Consider practice and use of space alongside equipment

DfE’s examples include visual supports, changes to environmental conditions and carefully selected technology. These describe possible ways of improving accessibility; the school still needs to establish the appropriate response to its own identified barrier. [3]

An initial change might concern how a room is organised, the number of competing instructions or the timing of a transition. Another difficulty may warrant a resource trial or a more substantial assessment. Make the intended use clear. A space needs arrangements for access, supervision and return to learning as well as a list of items to place in it.

Keep the funding route attached to the proposed work

The Inclusive Mainstream Fund excludes capital works. Establish how the proposed expenditure is classified before assigning IMF funding. Any capital works need an appropriate separate funding route; a sensory or accessibility purpose does not itself make a purchase eligible. Ask finance and estates colleagues which budget can properly meet each element. [1]

Ask suppliers to separate advice, equipment, installation, building work and continuing support in their proposals. This makes the comparison clearer and helps the school discuss eligibility with its finance and estates colleagues. Do not let a combined package obscure the different decisions or costs involved.

Find out how the proposed solution works in practice

A resource should have an intended user, a place in the school day and someone responsible for its use. Establish accessibility, supervision, maintenance and any relevant safety requirements. Where a trial is feasible, agree its purpose and review criteria before the school commits to a continuing purchase.

Ask what evidence supports the supplier’s claims and how closely that evidence matches the proposed use. A convincing demonstration is useful, but it is different from evidence that the product will improve a particular school’s outcomes. The provider comparison record helps keep that distinction visible.

Return to access and participation

Review whether the change was used as planned and whether the original difficulty became easier to manage. Consider pupils’ and staff’s experience, any unintended consequences and the cost of keeping the arrangement working. A quieter room is a description of the environment; the inclusion question concerns what pupils can now access or do. Where a change affects other pupils or staff, include their experience in the review.

Take the findings back to the impact review. Leaders should leave with a reasoned next decision and a clear account of any difficulty that still needs investigation.

Prepare a useful conversation

Questions to take to a specialist

  1. What assessment supports the proposed change in our setting?
  2. Which costs are advice, equipment, installation or capital works?
  3. How will we test useful participation and identify unintended effects?

Use the support comparison record →

The decision to carry forward

Connect the assessment, purchase and review

Establish the environmental barrier and compare appropriate changes before selecting a product or works package.

Confirm the funding route, full costs and practical use before commissioning; review access after the change.

Sources and scope

The evidence behind this guidance

Sources checked 17 November 2026. School Connection’s working tools, examples and suggested review periods are editorial recommendations. The main grant guidance concerns relevant mainstream school recipients in England.

  1. DfE school grant conditions, 2026 to 2027 ↗Updated 1 July 2026

    The school-grant basis for eligibility, permitted spending, publication, records and carry-forward.

  2. DfE: inclusive mainstream fund best practice ↗Updated 7 August 2026

    Optional, non-exhaustive examples. These are not a supplier approval scheme or a requirement to purchase every type of provision.

Contains public sector information licensed under the Open Government Licence v3.0. Original School Connection analysis and working resources retain their stated publication terms. Linked third-party resources retain their own rights.